NXGEN assist with overflow management on local reservoir
We recently assisted with the installation of a variety of pipework aimed at improving overflow management for a local reservoir.
With sustainability at the forefront of the customers mind for this project we provided a fully electric crane, utilising the cranes innovative outrigger system.
Our highly skilled crane operator successfully configured the crane in both half and full rig setups, ensuring precision and efficiency throughout the project.
For sustainable lifting solutions, reach out to NXGEN Lifting